The Challenge:

Energy providers today are coping with higher demands than ever. Parts are subjected to unprecedented stress as plants are cycling more often and output is pushed to the maximum.

As a result, a major energy provider in North America was wrestling with repeated control valve issues in its boiler main feed pump recirculation application at a 570MW 2×1 Combined Cycle Power Plant (CCPP).

These were affecting both process control optimisation and overall plant performance and reliability. As the plant manager had experience of the “minimal maintenance and exceptional performance” of IMI Critical’s valves, in 2019 he contacted IMI CCI for a long-term solution to the control valve problem.

The Solution:

An IMI CCI team went onsite and found the existing valves’ conventional cage technology had just four stages of pressure reduction. This allowed fluid velocities that were more than twice the recommended trim exit velocity of under 100 ft/s, and this was causing cavitation, erosion, and high noise.

A drastic increase in pressure letdown stages was recommended. Using IMI Critical’s innovative Retrofit3D solution, which uses additive manufacturing to design trim to be retrofitted in existing valves, a solution was designed that would limit the trim exit velocity to 60 ft/s and keep the noise level below 75dBA.

Two years after the multi-stage DRAG® Disk Stack, plug assembly and seat ring were installed, and the client reports excellent valve performance. This has led the client to commission seven more valve trim retrofits, with more to come.

Plant manager: “The high pressure hi/lo feedwater valve has been performing very well. It operates very smoothly, transitions well and is sized right, now that we’re using the full stroke. The valves on the condensate to the fuel gas heaters always cavitated very badly and now they are very quiet.”

The new trim has reduced planned maintenance at the plant.

“We used to rebuild [the recirculation valves] every year as planned maintenance (PM). We have only inspected the IMI CCI trim in the last two years and they look new still, with no sign of wear or cavitation.”

There have been substantial cost savings too.

“We were spending ~$150-200k on valve trim and soft goods annually, not including labour and crane services. There are seven sets of Retrofit 3D trims in service now. We will inspect the Retrofit3D trim in each new application at 1-2- and 4-year cycles until we can set a preventive maintenance frequency.”

Contact us at retrofit3d@imi-critical.com for more information and to speak to our product experts.

View and download a PDF copy of this case study.

For more information and to speak to our product experts, please submit the form below: